Innovative shore protection

EcoShore Internatio
nal is a coastal engineering company, dedicated to the implementation of environmentally sound and financially attractive beach preservation techniques.

As suitable sand sources are drying out it becomes ever more important that beach erosion is reduced to a minimum. For beach nourishment projects to last it is important to know the factors influencing the erosion at the location.

At EcoShore we study the site carefully and often do ground water studies as well as off-shore studies before making any suggestions. Our staff includes professional engineers and individuals with experience on coastal and environmental matters.

We are able to apply a number of methods to reduce the erosion to a minimum, or even turn a traditionally eroding beach into a neutral or accretional beach.

A key technology we have access to is the environmentally friendly PEM technology - (Pressure Equalizing Modules), a benign and economical solution that has been applied successfully in Europe, Asia and Africa.

For more information on PEM see the following pages.

....... 

HILLSBORO BEACH  - THE FIRST PEM PROJECT IN THE USA

On Feb. 28, 2008 the first PEM project was completed in the USA. For more information on the project,  photos from the installation, etc. please visit the Town of Hillsboro Beach.

Read the story in the leading newspaper:

Website updated  Sep 14, 2008

_______________________________________

www.ecoshore.com

 

 

 

 

Learn more about PEM
 
Information
Summary of the PEM System
Beach Nourishment + PEM
PEM and the environment
Questionnaire
White Paper, Consulting Eng.
 
Projects
Skodbjerge, Denmark         Largest project, 7 miles
Teluk Chempedak, Malaysia    PEM with beach nourishment
Skagen South, Denmark  University controlled project
Skagen North, Denmark          PEM and groins
Lonstrup, Denmark             PEM and breakwaters
Ribersborg, Sweden          PEM on artificial beach
Maarup, Denmark               PEM and bluffs
 
 

 

   Check what the customers told Erosion Control about their PEM system